Skip to content
Charging location

Martigny Supercharger

OCM-75014 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

A9
Martigny
1920
Switzerland

Summary

Number Of Stations/Bays
8
Usage
Public - Membership Required
Usage Cost
CHF 0.30/kWh; Andere Tarife für ältere Autos/Autres tarifs pour les voitures anciennes/altre tariffe per le auto più vecchie
Operational Status
Operational
Latitude
46.127743
Longitude
7.059962
OCM Ref
OCM-75014

General Information

6 Superchargers, available 24/7

Network/Operator

Tesla (Tesla-only charging)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

NACS / Tesla Supercharger

8 present
Operational
120 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Rastanlage Martigny, A9, Martigny, 1920, Switzerland
0.01 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Rue du Battoir 6, Martigny, VS, Italy
1.28 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Rue d'Aoste, 3, Martigny, Vallese, 1920, Switzerland
1.82 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
A9, Martigny, Martigny, 1920 , Switzerland
2.51 Miles Public - Pay At Location Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
A9, Martigny, Martigny, 1906, Switzerland
2.8 Miles Public - Pay At Location Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)

21

21, Martigny-Combe, 1920, Switzerland
2.83 Miles Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
100 Route des Cerniers, Les Giettes, 1871, Switzerland
8.17 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2022-01-13
Uploaded by ForumElettrico.it on 2022-01-13
Uploaded by ForumElettrico.it on 2022-01-13
Uploaded by ForumElettrico.it on 2022-01-13
Uploaded by polianto on 2017-04-25