Skip to content
Charging location

GOFAST ASTRA Pierre Avoi

OCM-128385 Planned For Future Date Public - Pay At Location
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

A9
Martigny
Martigny
1906
Switzerland

Summary

Number Of Stations/Bays
2
Usage
Public - Pay At Location
Operational Status
Planned For Future Date
Latitude
46.1252656833303
Longitude
7.11833117721551
OCM Ref
OCM-128385

Network/Operator

GOFAST (Gotthard Fastcharge)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Planned For Future Date
150 kW
DC

CHAdeMO

1 present
Planned For Future Date
DC

Type 2 (Tethered Connector)

1 present
Planned For Future Date
43 kW
400 V
64 A
AC (Three-Phase)

Type 2 (Socket Only)

1 present
Planned For Future Date
22 kW
400 V
32 A
AC (Three-Phase)

Tesla (Model S/X)

1 present
Planned For Future Date
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

A9, Martigny, Martigny, 1920 , Switzerland
0.39 Miles Public - Pay At Location Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
Rue du Battoir 6, Martigny, VS, Italy
2.09 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Rue d'Aoste, 3, Martigny, Vallese, 1920, Switzerland
2.29 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
A9, Martigny, 1920, Switzerland
2.8 Miles Public - Membership Required Operational Level 3: High (Over 40kW) NACS / Tesla Supercharger
Rastanlage Martigny, A9, Martigny, 1920, Switzerland
2.81 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)

21

21, Martigny-Combe, 1920, Switzerland
4.04 Miles Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
70 Rue de Medran, Verbier, 1936, Switzerland
5.95 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Upload your own photos for this location Sign In