To edit, add comments or upload photos: Sign In
(DAYA GREEN) Senayan Parkcharging location
Nearest Address:
(DAYA GREEN) Senayan Park,
Jl Gerbang Pemuda
Jakarta Selatan
DKI Jakarta
10270
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh ++
Operational Status:
Operational
Latitude:
-6.212361985040431
Longitude:
106.80559785361322
OCM Ref: OCM-475517
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-798521
47 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SPKLU Elevated Parkir Utara GBK
SPKLU Elevated Parkir Utara GBK,
Kawasan Gelora Bung Karno
Jakarta Selatan
DKI Jakarta
Indonesia
View
0.34 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Menara BNI Pejompongan
Jl. Pejompongan Raya No.7, RT.1/RW.5, Bend. Hilir, Kecamatan Tanah Abang
Jakarta Pusat
Jakarta
10210
Indonesia
View
0.62 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Brilian Center
Jl. Jend. Sudirman No.Kav. 44 - 46, Bend. Hilir, Kecamatan Tanah Abang
Jakarta Pusat
Jakarta
10210
Indonesia
View
0.65 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Mobility Urban HUB
0.67 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Dipo Tower
0.73 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Artotel Gelora Senayan
0.79 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kompas Gramedia Palmerah
0.81 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Shell Pacific Place
0.88 Miles
Public
Operational
Public
Operational
(TERRA CHARGE) FX Sudirman
0.89 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In