To edit, add comments or upload photos: Sign In
Brilian Centercharging location
Nearest Address:
Jl. Jend. Sudirman No.Kav. 44 - 46, Bend. Hilir, Kecamatan Tanah Abang
Jakarta Pusat
Jakarta
10210
Indonesia
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Rp2467/kWh
Operational Status:
Operational
Latitude:
-6.2164352
Longitude:
106.8141387
OCM Ref: OCM-267669
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-456206
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
1 Present
OCM-CN-456207
25 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-456208
25 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SPKLU Elevated Parkir Utara GBK
SPKLU Elevated Parkir Utara GBK,
Kawasan Gelora Bung Karno
Jakarta Selatan
DKI Jakarta
Indonesia
View
0.45 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plaza Mandiri
Jl. Gatot Subroto No.Kav 36-38, RT.7/RW.3, Senayan, Kec. Kby. Baru
Jakarta Selatan
Jakarta
12190
Indonesia
View
0.59 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
(DAYA GREEN) Senayan Park
0.65 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Shell Pacific Place
0.72 Miles
Public
Operational
Public
Operational
Electronic City SCBD
0.74 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(STROOM) SCBD Park
0.76 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(HVT) Sudirman Park
0.81 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Medco Energy Building
0.85 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Artotel Gelora Senayan
0.9 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In