To edit, add comments or upload photos: Sign In
BeCharge Castel Maggiore Kennedycharging location
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Planned For Future Date
Latitude:
44.57577417493414
Longitude:
11.36161354601984
OCM Ref: OCM-171671
Network/Operator
Be Charge (Italy) https://www.bec.energy/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Planned For Future Date
2 Present
OCM-CN-262516
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Campi Sportivi Castel Maggiore | EnelX
0.18 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Lipparini | EnelX
2.48 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stiatico Alessandrini | EnelX
1
4
3 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Castel Bolognese | EnelX
3.03 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Corticella
2
5
3.07 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Zona Sportiva Arcoveggio | EnelX
3.37 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Interporto Bologna S.p.A.
3.74 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
ParkinGO BOLOGNA
1
1
3.88 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Via Stalingrado
4
6
3.88 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In