Skip to content
Charging location

EVAD Franciacorta Outlet Village

OCM-93133 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Via Girolamo Romanino
Rodengo-Saiano
BS
25050
Italy

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Operational Status
Operational
Latitude
45.5750789338909
Longitude
10.1209143059805
OCM Ref
OCM-93133

Access Information

Inside the outlet parking

Network/Operator

Enel X

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Operational
50 kW
DC

CHAdeMO

2 present
Operational
50 kW
DC

Type 2 (Tethered Connector)

2 present
Operational
43 kW
400 V
64 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In
General Comment Charged Successfully

Nessun problema sulla colonnina di destra, infilando prima il cavo CCS Combo 2 nell'auto e poi passando NFC Enel X Way, ed ho interrotto avvicinandomi all'auto e premendo il pulsante sulla presa auto. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post353037.html#p353037

Comment by ForumElettrico.it · 12/11/2022 14:36:04
General Comment Charged Successfully Rating: 5 out of 5

Comment by AndreaCotti-Cometti · 12/18/2020 11:53:48
General Comment Charged Successfully Rating: 5 out of 5

Seconda fast accesa e funzionante

Comment by polianto · 09/30/2018 16:55:46
General Comment Charged Successfully

http://www.forumelettrico.it/forum/terza-fast-brescia-rodengo-saiano-t1487.html

Comment by ForumElettrico.it · 10/11/2017 16:57:59

Other Charging Locations

There are 9 matching results

Via del Commercio, Rodengo Saiano, Lombardia, 25050, Italy
0.26 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Pietro Trebeschi, Castegnato (Bs), Lombardia, 25045, Italy
0.89 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Largo Illa Romagnoli, Ingresso da Via Francesco Franchi, Castegnato, BS, 25045, Italy
1.48 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Padana Superiore, Castegnato, BS, 25045, Italy
1.6 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Padana Superiore, Castegnato, BS, 25045, Italy
1.61 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)

A2A Conad

2 2
Viale Italia 17, Gussago, BS, Italy
1.86 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)

A2A

2 2
Via Giancarlo Peracchia 18, Gussago, BS, Italy
2.01 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Padana Superiore, Ospitaletto, BS, Italy
2.06 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Otorino Marcolini 2, Gussago, Lombardy, 25064, Italy
2.17 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by polianto on 2018-09-30

www.powercruisecontrol.com

Uploaded by PowerCruiseControl on 2018-06-28
Uploaded by polianto on 2017-11-01
Uploaded by ForumElettrico.it on 2017-10-11