Skip to content
Charging location

Fairfield Inn & Suites By Marriott Little Rock

OCM-92537 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

17320 I-30
Benton
Arkansas
72019
United States
(501) 722-6330

Summary

Number Of Stations/Bays
4
Usage
Public - Membership Required
Operational Status
Operational
Latitude
34.5806529
Longitude
-92.5819311
OCM Ref
OCM-92537

General Information

4 Tesla Connectors, up to 16kW.Available for customers. Please see front desk.

Network/Operator

Tesla (Tesla-only charging)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Tesla (Model S/X)

4 present
Operational
16 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

403 N. Main, Benton, AR, 72015, United States
0.97 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
19723 I-30, Bentoin, AR, 72015, United States
2.25 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
19960 I-30, Benton, AR, 72019, United States
2.46 Miles Public Operational Level 2 : Medium (Over 2kW) Type 1 (J1772)
7801 Alcoa Rd, Benton, AR, 72019, United States
3.36 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
23190 I-30, Bryant, AR, 72202, United States
5.57 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 1)
Upload your own photos for this location Sign In