Skip to content
Charging location

CLG Ard an Rátha

OCM-511006 Operational Public - Membership Required
To edit, add comments or upload photos Sign in

Nearest Address

Kentucky
Ardara
Co. Donegal
Ireland

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Operational Status
Operational
Latitude
54.77039884455451
Longitude
-8.414392955510039
OCM Ref
OCM-511006

Network/Operator

ePower
1800 99 88 77

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Operational
47 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

R261, Kilclooney Beg, Co. Donegal, Ireland
3.72 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
N56, Glenties, Co. Donegal, Ireland
4.98 Miles Public - Membership Required Planned For Future Date
N56, Glenties, County Donegal, Ireland
5.51 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
R263, Killybegs, County Donegal, Ireland
9.36 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Shore Rd, Killybegs, Co. Donegal, Ireland
9.67 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Chapel Rd, Dungloe, Co. Donegal, Ireland
12.56 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Lower Main Road, County Donegal, County Donegal, Ireland
12.6 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
The Mullins, Donegal Town, F94 HD99, Ireland
14.12 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Upload your own photos for this location Sign In