To edit, add comments or upload photos: Sign In
(SSK) RSU Bunda Margondacharging location
Nearest Address:
(SSK) RSU Bunda Margonda,
Jl Raya Margonda
Depok
Jawa Barat
16424
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh
Operational Status:
Operational
Latitude:
-6.365385
Longitude:
106.83444
OCM Ref: OCM-510686
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-879773
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Walking Drums
0.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(Astra Otopower) KFC margonda
0.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(Parking Plus) FEB Universitas Indonesia
(Parking Plus) FEB Universitas Indonesia,
Jl Prof. Dr. Sudjono D. Pusponegoro
Depok
Jawa Barat
16424
Indonesia
View
0.66 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BYD Arista Depok
1.08 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hyundai Margonda
1.1 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
McDonald's Margonda
1.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Pesona Square Depok
1.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hyundai Cimanggis
1.79 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Universitas Pancasila
1.83 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In