Plenitude Ufficio Postalecharging location
Plenitude On The Road (EU) https://eniplenitude.eu/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok sulla presa di sinistra, e in paese ci sono diversi bar ma allo stato attuale nessun ristorante attivo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-ufficio-postale-lugagnano-val-d-arda-pc-via-san-giovanni-bosco-11-t47305.html
https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-ufficio-postale-lugagnano-val-d-arda-pc-via-san-giovanni-bosco-11-t47305.html Comment by ForumElettrico.it 09/28/2026 06:39:51
Other Charging Locations
There are 9 matching results
Lugagnano Piazza Casana | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio Vernasca | EnelX
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vigoleno | EnelX
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parrocchia Santa Maria Assunta Rustigazzo | EnelX
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Poste Italiane
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Salsomaggiore Area Mercatale | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Salsomaggiore Parco Corazza | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Morfasso San Michele
1
1
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Salsomaggiore Terme Unità | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-09-28
Uploaded by ForumElettrico.it on 2026-09-28
Uploaded by ForumElettrico.it on 2026-09-28
Uploaded by ForumElettrico.it on 2026-09-28
Uploaded by ForumElettrico.it on 2026-09-28