To edit, add comments or upload photos: Sign In
Teboil Московский проспектcharging location
Nearest Address:
Москвский проспект, д. 7А
Воронеж
394026
Russian Federation
Usage:
Public - Membership Required
Operational Status:
Not Operational
Latitude:
51.682423
Longitude:
39.18326
OCM Ref: OCM-509454
Network/Operator
Punkt-E https://punkt-e.ru/ +78002223700
Data Provider:
Punkt-E https://punkt-e.ru/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
36507
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Not Operational
1 Present
OCM-CN-876966
60 kW
DC
300 V
200 A
GB-T DC - GB/T 20234.3
Not Operational
1 Present
OCM-CN-876967
60 kW
DC
240 V
250 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
3608
0.53 Miles
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Ситроникс
1.12 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
АЗС Лукойл Шишкова
1.25 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E-WAY 150kW (DC) ЦУМ / "Marriot"
1.42 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ЦУМ / "Марриот"
1.42 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
3601
1.79 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Смтроникс
1.82 Miles
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Evolute #169
1.82 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Evolute #168
1.83 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In