Skip to content
Charging location

Ewiva Q8

OCM-506285 Operational Public
To edit, add comments or upload photos Sign in

Summary

Number Of Stations/Bays
4
Usage
Public
Operational Status
Operational
Latitude
45.056875
Longitude
9.583228
OCM Ref
OCM-506285

Network/Operator

Ewiva (IT)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
100 out of 100
  • User Feedback - Has recent user verification
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

8 present
Status Unknown
300 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Via Emilia Pavese Ovest, San Nicolò, Rottofreno, PC, 29010, Italy
0.76 Miles Public - Pay At Location Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via dell' Industria, Gragnano Trebbiense, PC, 29010, Italy
1.65 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Emilia Pavese 195, Piacenza, PC, Italy
3.01 Miles Public Not Operational Level 3: High (Over 40kW) CCS (Type 2)
Via E. Carella, Gragnano Trebbiense, PC, 29010, Italy
3.27 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Emilia Pavese 114/A, Piacenza, PC, Italy
3.77 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Atleti Azzurri d'Italia 12, Piacenza, PC, Italy
3.78 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Emilia Piacentina, Casoni, Sarmato, PC, Italy
3.92 Miles Public - Membership Required Temporarily Unavailable Level 2 : Medium (Over 2kW) SCAME Type 3A (Low Power)
Strada Gragnana 17, Piacenza, PC, Italy
3.92 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Emilia Pavese 42, Piacenza, PC, Italy
4.43 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2026-08-25
Uploaded by ForumElettrico.it on 2026-08-25
Uploaded by ForumElettrico.it on 2026-08-25
Uploaded by ForumElettrico.it on 2026-08-25
Uploaded by ForumElettrico.it on 2026-08-25