Skip to content
Charging location

IPlanet IP

OCM-505827 Operational Private - For Staff, Visitors or Customers
To edit, add comments or upload photos Sign in

Summary

Number Of Stations/Bays
2
Usage
Private - For Staff, Visitors or Customers
Operational Status
Operational
Latitude
45.709909
Longitude
8.901376
OCM Ref
OCM-505827

Network/Operator

iPlanet (IT)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
100 out of 100
  • User Feedback - Has recent user verification
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Status Unknown
300 kW
DC

CHAdeMO

1 present
Status Unknown
60 kW
DC

Type 2 (Socket Only)

1 present
Status Unknown
22 kW
AC (Three-Phase)

CCS (Type 2)

1 present
Status Unknown
180 kW
DC

Add your own comment/check-in for this location

Sign In
General Comment Charged Successfully

Tutto ok fino ad almeno 231,8 kW e nella stazione di servizio c'è anche un bar attivo e molto frequentato, quindi se da un lato ci si può ristorare durante la ricarica, dall'altro è facile trovare qualche stallo abusato. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-iplanet-high-power-ip-tradate-va-via-bruno-passerini-3-t46913.html

Comment by ForumElettrico.it · 08/22/2026 15:29:39

Other Charging Locations

There are 9 matching results

Via San Lucio, Lonate Ceppino, VA, 21050, Italy
0.81 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Libertà, Via della Giustizia, Lonate Ceppino, VA, 21050, Italy
1.13 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via della Crocetta, Lonate Ceppino, VA, 21050, Italy
1.27 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Matteotti, Lonate Ceppino, VA, 21050, Italy
1.4 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Fratelli Kennedy, 16, Venegono Inferiore, VA, 21040, Italy
1.5 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Al Golf, 4, Appiano Gentile, 22070, Italy
2.6 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Via Solferino, Cascina Mirabello, Venegono Superiore, VA, 21040, Italy
2.71 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Papa Giovanni XXIII, 4, Cascina Mirabello, Venegono Superiore, VA, 21040, Italy
3.13 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2026-08-22
Uploaded by ForumElettrico.it on 2026-08-22
Uploaded by ForumElettrico.it on 2026-08-22
Uploaded by ForumElettrico.it on 2026-08-22
Uploaded by ForumElettrico.it on 2026-08-22