IPlanet IPcharging location
iPlanet (IT) https://iplanet.eu
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad almeno 233 kW e subito prima troviamo un bar tabacchino con accanto una trattoria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-iplanet-high-power-ip-gravellona-toce-vb-corso-roma-73-t46842.html
https://www.forumelettrico.it/forum/colonnine-iplanet-high-power-ip-gravellona-toce-vb-corso-roma-73-t46842.html Comment by ForumElettrico.it 08/15/2026 06:39:50
Other Charging Locations
There are 9 matching results
Tigros c/o Gravellona Park
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commerciale Le Isole Gravellona Toce | EnelX Fast
1
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Le Isole
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Casale Corte Cerro Fratelli Nolli | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CASALE CORTE CERRO Via Novara | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Atlante Gidoppia Feriolo
1
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Casale Corte Cerro XXV Aprile | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mergozzo Via Sempione | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Mergozzo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-08-15
Uploaded by ForumElettrico.it on 2026-08-15
Uploaded by ForumElettrico.it on 2026-08-15
Uploaded by ForumElettrico.it on 2026-08-15
Uploaded by ForumElettrico.it on 2026-08-15