To edit, add comments or upload photos: Sign In
SumpGuard Center, Industrial Areacharging location
Nearest Address:
Kampala Road
Landimawe ward
Nairobi
00507
Kenya
+254717134199
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-1.306707585481746
Longitude:
36.85329620370612
OCM Ref: OCM-503810
Network/Operator
Supa Chaja (KE) https://www.supachaja.com/ +254111219934
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-862772
30 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
The Point Mall Buruburu
1.77 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Holy Family Basilica Parking Silo
2
2.66 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Kenya Power Depot
3.28 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Stima Plaza Kenya Power
3.3 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Adlife Plaza
4.63 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Sarit Centre Nairobi
2
4.72 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Nopea JKIA Airport
5.51 Miles
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CHAdeMO
Waiyaki Way
3
6.2 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Nopea Ride Village Market
1
6.41 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In