To edit, add comments or upload photos: Sign In
Tesla Taxi EVChargercharging location
Nearest Address:
Ibrahim Rugova
Parallove
60000
Kosovo
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
0,45 €/kWh
Operational Status:
Operational
Latitude:
42.54910719230054
Longitude:
21.365336929462842
OCM Ref: OCM-500268
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
2 Present
OCM-CN-853604
11 kW
AC (Three-Phase)
CCS (Type 2)
Operational
1 Present
OCM-CN-853605
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
Taxi Tesla Charger 50kw
8.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Gracanica
9.76 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
HIB Petrol Caglavice
1
12.43 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Echarge-KS Olive Medical
12.54 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Shell Prishtina
1
12.55 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Echarge-KS
12.75 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
RapidCharge By Umbo
13.81 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In