To edit, add comments or upload photos: Sign In
Loriana Nardini Passo del Cerretocharging location
Nearest Address:
Via Provinciale 5/A
Fivizzano
MS
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
44.304313
Longitude:
10.217648
OCM Ref: OCM-498563
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
1 Present
OCM-CN-849319
50 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad 83 kW e si trova proprio sul Passo del Cerreto: pare già in Toscana ma il confine con l'Emilia Romagna sta a 50 metri. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-loriana-nardini-ultra-fast-fivizzano-ms-via-provinciale-5-a-passo-del-cerreto-t46527.html
https://www.forumelettrico.it/forum/colonnina-loriana-nardini-ultra-fast-fivizzano-ms-via-provinciale-5-a-passo-del-cerreto-t46527.html Comment by ForumElettrico.it 07/12/2026 17:51:49
Other Charging Locations
There are 9 matching results
Repower Camping Rio Bianco Cerreto Laghi
1
5
0.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Poste Italiane Collagna
1
5
4.22 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Ligonchio
1
5
6.26 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel Ligonchio
1
5
6.31 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Piazza della Libertà
6.41 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Be Charge Cerreto Laghi
1
5
6.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Morsiano
1
4
6.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cinquecerri
1
5
6.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Busana
1
5
6.76 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-07-12
Uploaded by ForumElettrico.it on 2026-07-12
Uploaded by ForumElettrico.it on 2026-07-12
Uploaded by ForumElettrico.it on 2026-07-12
Uploaded by ForumElettrico.it on 2026-07-12