To edit, add comments or upload photos: Sign In
Edison Next AdS Magra Estcharging location
Nearest Address:
A12 km 110 (verso Genova)
Vezzano Ligure
SP
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
44.137902
Longitude:
9.917067
OCM Ref: OCM-497273
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-846143
120 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Dotata di due CCS Combo 2 da almeno 100 kW ed è andata a sostituire una vecchia infrastruttura di ricarica non più funzionante da anni. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-next-ultra-fast-ads-magra-est-vezzano-ligure-sp-a12-km-110-verso-genova-t46277.html
https://www.forumelettrico.it/forum/colonnina-edison-next-ultra-fast-ads-magra-est-vezzano-ligure-sp-a12-km-110-verso-genova-t46277.html Comment by ForumElettrico.it 07/04/2026 15:07:09
Other Charging Locations
There are 9 matching results
IPlanet AdS Magra Ovest
1
5
0.09 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia RTA La Pineta
1
3
0.71 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via della Repubblica
1
2
1.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Arcola
2
9
1.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger CentroLuna - aperto a veicoli non Tesla
1
2
2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
COOP CC Centroluna by Duferco
5
16
2.04 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni Albiano Magra
1
5
2.38 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante Ceparana
1
5
2.58 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ricarica Multisala Moderno
1
3
2.64 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-07-04
Uploaded by ForumElettrico.it on 2026-07-04
Uploaded by ForumElettrico.it on 2026-07-04
Uploaded by ForumElettrico.it on 2026-07-04
Uploaded by ForumElettrico.it on 2026-07-04