Skip to content
Charging location

Pondok Pesantren Al Fattah

OCM-495249 Operational Public
To edit, add comments or upload photos Sign in

Nearest Address

Pondok Pesantren Al Fattah,
Desa Temboro, Kecamatan Karas
Magetan
Jawa Timur
Indonesia

Summary

Number Of Stations/Bays
1
Usage
Public
Usage Cost
IDR 2467/kWh
Operational Status
Operational
Latitude
-7.588081413509727
Longitude
111.39114218429961
OCM Ref
OCM-495249

Network/Operator

PLN (Indonesia)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Operational
60 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Jl Basuki Rahmat Utara, Magetan, Jawa Timur, 63361, Indonesia
6.32 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Rest Area KM 597 A Tol Ngawi Kertosono, Kabupaten Magetan, Jawa Timur , 63395, Indonesia
8.48 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Rest Area KM 597 B Tol Ngawi Kertosono, Magetan, Jawa Timur, 63395, Indonesia
8.54 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Fave Hotel Madiun, Jl Mayjen Sungkono, Madiun, Jawa Timur, Indonesia
9.11 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
McDonald's Madiun, , Jl Jenderal Sudirman, Madiun, Jawa Timur, 63117, Indonesia
9.53 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Jl Muhammad Husni Thamrin, Kota Madiun, Jawa Timur, 63119, Indonesia
10.03 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
PLN UP3 Madiun, , Jl. MT Haryono no.30, Madiun, Jawa Timur , Indonesia
10.22 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
PLN ULP Madiun Kota, Jl MT Haryono, Madiun, Jawa Timur, 63139, Indonesia
10.22 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Upload your own photos for this location Sign In