To edit, add comments or upload photos: Sign In
Edison Next Ospedalecharging location
Nearest Address:
Strada Barilla 16
Montecchio Emilia
RE
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
44.706662
Longitude:
10.450753
OCM Ref: OCM-492577
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
2 Present
OCM-CN-835683
50 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 49 kW ma attenzione solo al navigatore che tende a far passare per percorsi difficilmente utlizzabili in auto, forse con una moto da enduro :lol:. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-next-fast-ospedale-di-montecchio-emilia-re-strada-barilla-16-t46228.html
https://www.forumelettrico.it/forum/colonnina-edison-next-fast-ospedale-di-montecchio-emilia-re-strada-barilla-16-t46228.html Comment by ForumElettrico.it 06/07/2026 06:32:24
Other Charging Locations
There are 9 matching results
Ewiva Coop
1
5
0.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lampionet
1
5
1.74 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CONAD SUPERSTORE SANT'ILARIO | ENELX
2
6
2.92 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Romantik Hotel Delle Rose
3.07 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Parrocchia di Calerno | EnelX
5
9
3.37 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel Scuola Materna I Tigli
1
5
3.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel La Cremeria
1
5
3.46 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Conad
2
8
3.48 Miles
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Conad
1
5
3.56 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-06-07
Uploaded by ForumElettrico.it on 2026-06-07
Uploaded by ForumElettrico.it on 2026-06-07
Uploaded by ForumElettrico.it on 2026-06-07
Uploaded by ForumElettrico.it on 2026-06-07