Skip to content
Charging location

BP Pulse - CC Steel P1 Forez

OCM-492516 Operational Public
To edit, add comments or upload photos Sign in

Nearest Address

2 Rue Ferrer
P1 Forez
Saint-Jean-Bonnefonds
Auvergne-Rhône-Alpes
42000
France

Summary

Number Of Stations/Bays
52
Usage
Public
Operational Status
Operational
Latitude
45.44616839391111
Longitude
4.420139776203769
OCM Ref
OCM-492516

Network/Operator

BP Pulse (UK)
01582 400331

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

12 present
Operational
300 kW
DC

CCS (Type 2)

8 present
Operational
100 kW
DC

CHAdeMO

3 present
Operational
100 kW
DC

Type 2 (Socket Only)

1 present
Operational
22 kW
AC (Three-Phase)

CCS (Type 2)

32 present
Operational
50 kW
DC

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

2 Rue Ferrer , P3 Jarez, Saint-Jean-Bonnefonds, Auvergne-Rhône-Alpes, 42650, France
0.13 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
2 Rue Ferrer, P6 Pilat, Saint-Jean-Bonnefonds, Auvergne-Rhône-Alpes, 42650, France
0.16 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
140 Rue De La Montat, Centre Commercial Monthieux, Saint-Étienne, Auvergne-Rhône-Alpes, 42000, France
0.44 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
ZI Necker Rue du Rocher 42000 Saint-Etienne, France
0.78 Miles Public Operational Level 2 : Medium (Over 2kW) CEE 7/4 - Schuko - Type F
34 Rue Victor Grignard,42000 Saint-Étienne, France
1.02 Miles Public Operational Level 3: High (Over 40kW) Unknown
"34 Boulevard Jules Janin 42000 Saint-&Eacute, France
1.43 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In