To edit, add comments or upload photos: Sign In
Tesla Supercharger Dardilly Nordcharging location
Nearest Address:
2 Route Départementale 306
Dardilly
Auvergne-Rhône-Alpes
69570
France
Number Of Stations/Bays:
28
Usage:
Public
Operational Status:
Operational
Latitude:
45.82493620505301
Longitude:
4.761945120702791
OCM Ref: OCM-487699
Network/Operator
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
28 Present
OCM-CN-821943
250 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
DARDILLY PORTES LYON
0.22 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
DARDILLY PORTE DE LYON
0.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Tesla Supercharger Dardilly
0.33 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Auchan DARDILLY
0.41 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
PowerDot - Boulanger - Limonest
0.57 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIM01 - ZAC DU PUY DOR
0.75 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
DLM DARDILLY
1.04 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
TotalEnergies - Relais Bruyères Paisy
1.13 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIMONEST
1.38 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In