To edit, add comments or upload photos: Sign In
Outlet Utomodeck Groupcharging location
Nearest Address:
Outlet Utomodeck Group,
Jl Raya Kampus Unesa, Lidah Wetan
Surabaya
Jawa Timur
60213
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR2467/kWh ++
Operational Status:
Operational
Latitude:
-7.298229
Longitude:
112.669015
OCM Ref: OCM-486954
Network/Operator
CHARGE+ https://www.chargeplus.com
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-819772
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Waterplace Residence
0.46 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
National Hospital Surabaya
0.5 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mobility Hub Loop Graha Famili Phase 2
Mobility Hub Loop Graha Famili Phase 2,
Jl Bukit Darmo Boulevard, Babatan
Surabaya
Jawa Timur
60123
Indonesia
View
0.52 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Loop Graha Famili
0.56 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Spazio
0.83 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Citraland G Walk
1.09 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Citraland Vittorio
1.42 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SolaRUV - Ruko Darmo Permai
1.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Resto Ayam Goreng Gringging Lombok 2
1.73 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In