Skip to content
Charging location

Volvo - Pão de Açúcar - Taquaral

OCM-481279 Not Operational Public - Membership Required
To edit, add comments or upload photos Sign in

Nearest Address

Av. Barão de Itapura, 2233, Vila Rossi e Borchi, Campinas, SP
Campinas
Brazil

Summary

Usage
Public - Membership Required
Operational Status
Not Operational
Latitude
-22.885971
Longitude
-47.059847
OCM Ref
OCM-481279

Data Provider

Easy Volt
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License
CC-0
Providers Ref
2034627c-a782-4cb0-ad94-0c552ed9a3ab

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Tethered Connector)

1 present
Not Operational
22 kW
220 V
32 A
AC (Single-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Avenida José de Sousa Campos, 2550, Cambuí, Campinas, SP, Campinas, Brazil
1.17 Miles Public - Membership Required Not Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Av. Princesa D'Oeste, 1440 - Vila Lemos, Campinas - SP, 13026-137, Campinas, Brazil
1.9 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CHAdeMO
Av. Princesa D'Oeste, 1440 - Vila Lemos, Campinas - SP, 13026-137, Campinas, Brazil
1.9 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CHAdeMO
Av. Princesa d'oeste, 1467 - Jardim Primavera, Campinas, SP, Campinas, Brazil
1.94 Miles Public - Membership Required Not Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Avenida Washington Luis, 163 Ponte Preta Campinas, São Paulo, São Paulo, 13041-355, Brazil
2.04 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Av. Iguatemi, 777, Vila Brandina, Campinas, SP, Campinas, Brazil
2.1 Miles Public - Membership Required Not Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
140, Rod. Gov. Dr. Adhemar Pereira de Barros - Parque São Quirino, Campinas, São paulo, Brazil
2.19 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Avenida Benedito Campos, 109, Campinas, São Paulo, 13030-100, Brazil
3.13 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In