To edit, add comments or upload photos: Sign In
PLN ULP Prayacharging location
Nearest Address:
PLN ULP Praya, Jl Jenderal Sudirman
Lombok Tengah
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-8.708024
Longitude:
116.272317
OCM Ref: OCM-480111
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-805997
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Illira
3.48 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Bandara International Lombok
3.85 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Transmart Mataram
11.84 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SPKLU MANDALIKA (Kawasan ITDC)
12.66 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bank Mandiri Cakra
Bank Mandiri Cakea, Jalan AA. Gde Ngurah
Kel. Cakranegara Timur
Mataram
Nusa Tenggara Barat
83239
Indonesia
View
12.74 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Golden Palace
12.95 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Lombok Garden
13.4 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Epicentrum Mall
13.85 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLTU Jeranjang
13.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In