To edit, add comments or upload photos: Sign In
Mall Dinoyocharging location
Nearest Address:
Mall Donoyo,
Jl MT Haryono
Malang
Jawa Timur
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-7.9382
Longitude:
112.606925
OCM Ref: OCM-479795
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
2 Present
OCM-CN-805553
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Masjid Abdullah Permata Jingga
0.88 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Masjid Polinema
0.95 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Guest House UB
1.03 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
RS Universitas Brawijaya
1.06 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Transmart Malang
1.45 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Strudel Blimbing
2.35 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
BYD Haka Auto Malang
2.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPKLU Center Malang
2.95 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kantor Imigrasi Malang
2.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In