To edit, add comments or upload photos: Sign In
McDonald's Mayjen Sungkonocharging location
Nearest Address:
Jl Mayjend Sungkono
Surabaya
Jawa Timur
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-7.2887
Longitude:
112.7064896
OCM Ref: OCM-478677
Network/Operator
Voltron (Indonesia) https://voltron.id/ +62 8781 0584 499
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-804108
60 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-804109
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Transmart Dukuh Kupang
0.51 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Park & Ride Gunung Sari
0.6 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) Ciputra World Mall
0.96 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SolaRUV - Ruko Darmo Permai
1.59 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Spazio
1.99 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Loop Graha Famili
2.11 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(DAYA GREEN) Hotel Pop Diponegoro
2.13 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Mobility Hub Loop Graha Famili Phase 2
Mobility Hub Loop Graha Famili Phase 2,
Jl Bukit Darmo Boulevard, Babatan
Surabaya
Jawa Timur
60123
Indonesia
View
2.14 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Citraland Vittorio
2.16 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In