To edit, add comments or upload photos: Sign In
Terminal Joyoboyocharging location
Nearest Address:
Terminal Joyoboyo
Jl Joyoboyo
Surabaya
Jawa Timur
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh ++
Operational Status:
Operational
Latitude:
-7.2987
Longitude:
112.737315
OCM Ref: OCM-478659
Network/Operator
CHARGE+ https://www.chargeplus.com
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-804053
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(DAYA GREEN) Hotel Pop Diponegoro
0.39 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SPKLU Center Surabaya
1.11 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) Maspion Square
1.18 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Embong Wungu
1.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) Ciputra World Mall
1.27 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SPKLU PT PJB
1.55 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Park & Ride Gunung Sari
1.62 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Narita Surabaya
1.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Transmart Dukuh Kupang
1.77 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In