To edit, add comments or upload photos: Sign In
PLN ULP Pedancharging location
Nearest Address:
PLN ULP Pedan,
Jalan Gelora Merdeka, Sobayan
Klaten
Jawa Tengah
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR 2467/kWh ++
Operational Status:
Operational
Latitude:
-7.692351
Longitude:
110.702902
OCM Ref: OCM-478267
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-803185
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
PLN ULP3 Klaten
5.49 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 19 A Tol Solo Yogyakarta
6.47 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Klaten
7.42 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
RSUP DR Soeradji
7.99 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Tulung
8.57 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
SPBU 44.573.03 Jombor
9.31 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Grogol
9.35 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Sukoharjo Kota
9.43 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Menara One Sentosa
10.08 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In