To edit, add comments or upload photos: Sign In
PLN Enjiniringcharging location
Nearest Address:
PLN Enjiniring,
Jl KS Tubun
Jakarta Pusat
Jakarta
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-6.1869147913604365
Longitude:
106.80841753073241
OCM Ref: OCM-478160
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-802934
50 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-802935
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
[MY PERTAMINA] SPBU 31.102.02 Abdul Muis
0.89 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVCITY PLN UPDL Jakarta
0.93 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Wisma Barito Pacific
0.99 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Indosat Ooredoo
1.06 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
JB Tower
1.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Pullman Thamrin
1.13 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Menara Danareksa
1.17 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mall Taman Anggrek
1.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Dipo Tower
1.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In