To edit, add comments or upload photos: Sign In
Rest Area KM 726 B Tol Surabaya Mojokertocharging location
Nearest Address:
Rest Area KM 726 B Tol Surabaya Mojokerto
Gresik
Jawa Timur
61176
Indonesia
123
087771112123
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR2467/kWh++
Operational Status:
Operational
Latitude:
-7.375425479929888
Longitude:
112.55332704863099
OCM Ref: OCM-475658
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-798865
100 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-798866
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rest Area TRAVOY KM 725 A Tol Surabaya Mojokerto
0.57 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area TRAVOY KM 725 A Tol Surabaya Mojokerto
0.58 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Krian
3.09 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CV Multi Arta Kencana
6 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
The Samator Gresik
6.77 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ciputra University at Surabaya
8.2 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cornell Apartment & Soho
8.25 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Benjeng
8.73 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Resto Ayam Goreng Gringging Lombok 2
8.96 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In