To edit, add comments or upload photos: Sign In
Tecnaliacharging location
Nearest Address:
vitoria
Vitoria
Spain
Number Of Stations/Bays:
2
Usage:
Private - Restricted Access
Operational Status:
Operational
Latitude:
42.909170734339455
Longitude:
-2.6665092362091514
OCM Ref: OCM-475149
Network/Operator
Repsol - Ibil (ES) https://www.repsol.es/particulares/vehiculos/movilidad-electrica/ 902 540 810
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-797706
7.4 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Parque Tec. Alava
1
0.14 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parque Tecnológico Miñano
1
0.14 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IBIL - Parque Tecnológico Alava
0.14 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
CIC ENERGIGUNE
0.17 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Parque Tecnológico Miñano
0.19 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parque Tecnológico Miñano
1
0.34 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Tecnalia
0.39 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parque Tecnológico Miñano
1
0.42 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest. Lapatza (Atlante)
0.9 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In