To edit, add comments or upload photos: Sign In
Rasuna Said Gran Rubinacharging location
Nearest Address:
Rasuna Said Gran Rubina,
Jl Rasuna Said
Jakarta Selatan
DKI Jakarta
12940
Indonesia
Number Of Stations/Bays:
2
Usage:
Public - Pay At Location
Usage Cost:
IDR 3466/Kwh
Operational Status:
Operational
Latitude:
-6.219394688020984
Longitude:
106.83274775620146
OCM Ref: OCM-474883
Network/Operator
Starvo (Indonesia) https://starvo.co.id/ +62 2129215000
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-797207
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(ASTRA OTOPOWER) Graha Binakarsa
0.08 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Apartemen Taman Rasuna
0.26 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Universitas Perbanas
0.3 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Setiabudi One
0.36 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gama Tower
0.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Graha Paramita Kuningan
0.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Verde Two Apartment
0.39 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Trinity Tower
0.42 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
(STROOM) Muamalat Tower
0.44 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In