To edit, add comments or upload photos: Sign In
Mobilize - Renault Hénin-Beaumontcharging location
Nearest Address:
5 Chemin de Tournai
Noyelles-Godault
Hauts-de-France
62950
France
Number Of Stations/Bays:
6
Usage:
Public
Operational Status:
Operational
Latitude:
50.41545475904579
Longitude:
2.976231879850843
OCM Ref: OCM-471625
Network/Operator
Mobilize (FR) https://www.mobilize.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
6 Present
OCM-CN-792091
320 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-792092
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Auchan NOYELLES GODAULT
1
0.2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Citroën Noyelles-Godault
0.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Tesla Supercharger Noyelles-Godault
0.39 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Noyelles-Godault - Hôtel Première Classe
0.48 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Cinéville - Hénin-Beaumont
0.67 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Speed Park - Hénin-Beaumont
0.8 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Moy_Park_1
0.99 Miles
Public
Operational
Level 3: High (Over 40kW)
Unknown
Public
Operational
Level 3: High (Over 40kW)
Unknown
Hénin Beaumont - Parking de le Gare SNCF
1.16 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hénin Beaumont - Square Ilot Carnot
1.23 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In