Compensar Lagosolcharging location

Nearest Address:
Calle 17 sur # 5a-38
Nilo
Cundinamarca
Colombia

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Usage: Public - Membership Required
Usage Cost: COP 1450 kWh
Operational Status: Operational
Latitude: 4.224209789677758
Longitude: -74.69731107828432
OCM Ref: OCM-470948
Network/Operator

Terpel Voltex (Columbia) https://www.terpel.com/nueva-movilidad-y-energias/terpel-voltex 01 8000 518 555

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 70 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - No comments or check-ins
  •   User Feedback - No photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

Type 1 (J1772)

Operational
1 Present
OCM-CN-790992
7 kW AC (Three-Phase)

Type 2 (Tethered Connector)

Operational
1 Present
OCM-CN-790993
7 kW AC (Three-Phase)

Add your own comment/check-in for this location:

Sign In

Other Charging Locations

There are 3 matching results

Terpel Voltex Altoque Melgar
 

Autopista Bogotá Girardot - Boquerón - Fusagasugá
Melgar
Tolima
734001
Colombia
View
6.35 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)

Terpel Voltex Compensar Lagomar
 

Avenida de las Frutas
Comuna 5
Girardot
Cundinamarca
Colombia
View
8.36 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)

Terpel Voltex Molinos II
 

Autopista Ibagué-Girardot
Flandes
Tolima
Colombia
View
10.52 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3

Upload your own photos for this location: Sign In