Skip to content
Charging location

Fuente del canal (Gallur)

OCM-469454 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Gallur
Gallur
Spain

Summary

Number Of Stations/Bays
1
Usage
Public
Usage Cost
0,35€/kWh
Operational Status
Operational
Latitude
41.86847971844975
Longitude
-1.3185352620301956
OCM Ref
OCM-469454

Network/Operator

(Unknown Operator)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

1 present
Operational
11 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Avenida Libertad, Aragón, 50550, Spain
5.61 Miles Public Not Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Mallén, Mallén, Spain
5.73 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Plaza España, Bisimbre, Aragon, 50562, Spain
6.45 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Carretera de Tudela a Alagón, Aragón, 50630, Spain
7.62 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Autovía del Ebro, Aragón, 50690, Spain
8.34 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Buñuel, Buñuel, Spain
9.67 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Borja, Borja, Aragon, Spain
10.66 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Upload your own photos for this location Sign In
Uploaded by lm-ocm on 2025-11-16