To edit, add comments or upload photos: Sign In
Adgar Plantincharging location
Nearest Address:
Plantin en Moretuslei 12
Antwerpen
2018
Belgium
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
51.210928
Longitude:
4.418498
OCM Ref: OCM-463057
Network/Operator
Greems (IL) https://www.greems.io/
Data Provider:
Greems Technologies http://www.greems.io
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC0
Providers Ref:
2db47387-c7da-4d0c-ac2f-f3ee9c69311c
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779058
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779059
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779060
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779061
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779062
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779063
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779064
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779065
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779066
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779067
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779068
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779069
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Planned For Future Date
1 Present
OCM-CN-779070
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779071
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779072
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779073
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779074
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779075
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779076
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779077
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779078
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-779079
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
B-Parking Central Station Antwerpen (P1)
2
0.21 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
TotalEnergies Antwerpen-Zuid
0.33 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Quellin
2
0.35 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Europlug 2-Pin (CEE 7/16)
Public
Operational
Level 2 : Medium (Over 2kW)
Europlug 2-Pin (CEE 7/16)
Van Eycktunnel
0.43 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Nationale Bank
1
0.46 Miles
Public - Membership Required
Operational
Public - Membership Required
Operational
Interparking Stadsschouwburg car park
0.49 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Interparking Inno car park
0.49 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Radisson Blu Astrid Hotel
0.56 Miles
(Unknown)
Operational
(Unknown)
Operational
Koningin Astridplein
0.57 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In