To edit, add comments or upload photos: Sign In
Tesla underground AC22 Конюшенная Пл.charging location
Nearest Address:
Конюшенная площадь, 2В
Санкт-Петербург
Russian Federation
Usage:
Public - Membership Required
Operational Status:
Unknown
Latitude:
59.9402122
Longitude:
30.3271313
OCM Ref: OCM-310578
Access Information:
Зарядные разъемы: Type2 (кабель) Gba ac (кабель)
Network/Operator
it Charge (RU) https://itcharge.ru/
Data Provider:
ITCharge https://itcharge.ru
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
fe997f82-1744-48e7-90f5-fe1d4148e96f
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
GB-T AC - GB/T 20234.2 (Socket)
Unknown
1 Present
OCM-CN-597270
22 kW
AC (Three-Phase)
380 V
32 A
Type 2 (Socket Only)
Unknown
1 Present
OCM-CN-597271
22 kW
AC (Three-Phase)
380 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ПИК ТРК
0.99 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ZEVS Рубинштейна
1 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Невский Центр
1.23 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ZEVS у отеля Санкт-Петербург
1.24 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Лангензипен ТЦ
1.34 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Россети №38
1.41 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Боровая 42Б
1.82 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
RuCharge
1.91 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Россети №53
1.94 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In