Autostrada del Brennero AdS Campogalliano Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Si tratta di 2 colonnine ABB, ciascuna con 2 connettori CCS, indicate sul sito A22 di potenza pari a 150 kW ma in realtà danno di più. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-high-power-ads-campogalliano-est-mo-a22-km-309-verso-brennero-t41282.html
https://www.forumelettrico.it/forum/colonnine-high-power-ads-campogalliano-est-mo-a22-km-309-verso-brennero-t41282.html Comment by ForumElettrico.it 07/08/2025 13:19:20
Other Charging Locations
There are 9 matching results
Autostrada del Brennero AdS Campogalliano Ovest
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVAD Conad
4
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Campogalliano Supercharger
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
4 Madonne Caseificio dell'Emilia
2
5
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free to X AdS Secchia Est
3
11
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Progeo Molini
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free to X AdS Secchia Ovest
5
14
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Soliera SP413 | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Le Gallerie Sicem
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-07-08
Uploaded by ForumElettrico.it on 2025-07-08
Uploaded by ForumElettrico.it on 2025-07-08