AP Hotel Airportcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Electra https://www.go-electra.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Two Alpitronic Hypercharger HYC300 DC chargers that allows charging one vehicle at 300kW, or two simultaneous charges at 150kW. (max power is limited for 400V cars)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Zleep Madrid Airport
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Holiday Inn Express Madrid Airport
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Go Barajas
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Ibis Budget Madrid Aeropuerto
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
B&B Hotel Madrid Airport
Private - For Staff, Visitors or Customers
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Madrid Airport Suites
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Crowne Plaza Madrid Barajas
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel AC Coslada Aeropuero
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest. Asador 7 de Julio
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In