Autostrada del Brennero AdS Povegliano Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Due colonnine con 4 CCS Combo 2, non in roaming ma attivabili tramite il proprio accettatore ad un prezzo molto conveniente. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-autostrada-del-brennero-high-power-ads-povegliano-est-km-240-78-a22-km-240-78-verso-brennero-t39999.html
https://www.forumelettrico.it/forum/colonnine-autostrada-del-brennero-high-power-ads-povegliano-est-km-240-78-a22-km-240-78-verso-brennero-t39999.html Comment by ForumElettrico.it 12/18/2024 11:04:41
Other Charging Locations
There are 9 matching results
Be Charge Via Roma
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Nogarole Rocca
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Agriturismo Corte Scaligera | Driwe
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Stazione di servizio B-Petrol
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ENEL X Via San Giovanni di Paglia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Expo Verona
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Relais Otto Ducati d'Oro
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Impianti Sportivi
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-12-18
Uploaded by ForumElettrico.it on 2024-12-18
Uploaded by ForumElettrico.it on 2024-12-18
Uploaded by ForumElettrico.it on 2024-12-18
Uploaded by ForumElettrico.it on 2024-12-18