Skip to content
Charging location

Ayunt. Sevilla.Calle Gaviota 17 (Eranovum)

OCM-304990 Planned For Future Date Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Calle Gaviota
Distrito Cerro-Amate
Andalucía
41006
Spain

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Usage Cost
0,32€/kWh AC
Operational Status
Planned For Future Date
Latitude
37.384293778624965
Longitude
-5.9555265329931615
OCM Ref
OCM-304990

Network/Operator

Eranovum (ES)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
80 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Operational
22 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Calle Contador, Distrito Cerro-Amate, Andalucía, 41006, Spain
0.23 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Calle Manuel Velasco de Pando, San Pablo-Santa Justa, Andalucía, 41007, Spain
0.38 Miles Public - Membership Required Planned For Future Date Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Avenida Montes Sierra, Distrito San Pablo-Santa Justa, Andalucía, 41007, Spain
0.62 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Gran Plaza, Nervión, Andalucía, 41005, Spain
0.64 Miles Public - Membership Required Planned For Future Date Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by lm-ocm on 2024-10-10