Skip to content
Charging location

CBR-00008

OCM-30133 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Rua 5 de Outubro
Coimbra
3045-208
Portugal

Summary

Number Of Stations/Bays
2
Usage
Public - Membership Required
Usage Cost
Mobi.E compatible card
Operational Status
Operational
Latitude
40.197425
Longitude
-8.462
OCM Ref
OCM-30133

Network/Operator

Mobie.pt

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Providers Ref
CBR-00008

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Operational
3.7 kW
230 V
16 A
AC (Single-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Rua do Lagar, Coimbra, Coimbra, 3030, Portugal
0.69 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Rua Central da Mesura, Coimbra, 3040-197, Portugal
0.86 Miles Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Rua do Bairro Azul, Coimbra, Centro, 3000, Portugal
0.9 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Rua do Lagar, Lote 1, Coimbra, 3040-005, Portugal
1.15 Miles Not Operational Level 3: High (Over 40kW) CHAdeMO
1 Avenida José Bonifácio de Andrade e Silva, Coimbra, Coimbra, 3040-389, Portugal
1.38 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In