To edit, add comments or upload photos: Sign In
Rest Area "Travoy" KM 538 A Tol Solo Ngawicharging location
Nearest Address:
Rest Area Travoy KM 538 A Tol Solo - Ngawi
Kabupaten Sragen
Jawa Tengah
57252
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
Rp.2467/kWh
Operational Status:
Operational
Latitude:
-7.393221130664699
Longitude:
111.0511266084377
OCM Ref: OCM-298382
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-545173
50 kW
DC
0 V
CHAdeMO
Operational
1 Present
OCM-CN-545174
50 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-545175
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 7 matching results
Rest Area KM 538 B Tol Solo - Ngawi
0.07 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Sragen
3.15 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Kantor Terpadu Pemkab Sragen
3.76 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Mantingan
7.35 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 519 B Tol Solo - Ngawi
10.79 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 519 A Tol Solo - Ngawi
10.89 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Sumberlawang
14.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In