Ruška kočacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
You can ask for charge on ordinary schuko, but you need 10m extension cord. Slow, but if can be very usefull if you stay over night.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
You can ask for charge on ordinary schuko, but you need 10m extension cord. Slow, but if can be very useful if you stay over night.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Bolfenk
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
HE Fala
1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Elevat Tinje
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
UniFit Nova Vas Maribor
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Interspar Qlandia Maribor 2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Elevat AC Fram
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Veselova ulica
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Bajt Maribor
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Občina Hoče Slivnica
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In