Skip to content
Charging location

Ewiva The Style Outlets Poggio Piccolo

OCM-273366 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Summary

Number Of Stations/Bays
2
Usage
Public
Operational Status
Operational
Latitude
44.43477896679178
Longitude
11.609844976838758
OCM Ref
OCM-273366

Network/Operator

Ewiva (IT)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

4 present
Operational
150 kW
DC

Add your own comment/check-in for this location

Sign In
General Comment Charged Successfully

Situate davanti all'ingresso del centro commerciale Castel Guelfo The Style Outlets, dopo le Be Charge e le Hera. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-the-style-outlets-castel-guelfo-di-bologna-bo-via-della-concia-15-b-poggio-piccolo-t37008.html

Comment by ForumElettrico.it · 04/18/2024 16:21:12

Other Charging Locations

There are 9 matching results

Via del Commercio, 4/2, Castel Guelfo di Bologna, BO, 40023, Italy
0.11 Miles Private - For Staff, Visitors or Customers Planned For Future Date
Via del Commercio 17/B, Castel Guelfo di Bologna, BO, Italy
0.17 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Golini Giulio, 61/8, Castel San Pietro Terme, BO, 40024, Italy
0.56 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
A14 km 706 (verso Bologna), Castel San Pietro, BO, 40064, Italy
0.59 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Autostrada Adriatica, Castel San Pietro Terme, Emilia-Romagna, 40024, Italy
0.78 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via S. Paolo, 594, Medicina, BO, 40059, Italy
2.67 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via A. Saffi, 1, Medicina , BO, 40059, Italy
3.06 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2024-04-18
Uploaded by ForumElettrico.it on 2024-04-18
Uploaded by ForumElettrico.it on 2024-04-18
Uploaded by ForumElettrico.it on 2024-04-18
Uploaded by ForumElettrico.it on 2024-04-18