To edit, add comments or upload photos: Sign In
PLN UID Jawa Tengah & DI Yogyakartacharging location
Nearest Address:
PLN UID Jawa tengah & DI Yogyakarta,
Jl. Teuku Umar No.47, Karangrejo, Kec. Gajahmungkur
Semarang
Jawa Tengah
50231
Indonesia
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
IDR 2467/kWh
Operational Status:
Operational
Latitude:
-7.0304215
Longitude:
110.4173686
OCM Ref: OCM-270817
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-460709
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
1 Present
OCM-CN-460710
60 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-460711
60 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-774517
100 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(DAYA GREEN) Hotel Grand Edge
1.34 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Semarang Selatan
1.36 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN Pusmanpro
1.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 424 B Tol Semarang - Banyumanik
1.69 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BTN Semarang
2.27 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Transmart Setia Budi
2.55 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Kantor Pemprov Jateng
1
2.58 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(DAYA GREEN) Ventura Taman Kuliner
2.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Semarang Timur
2.98 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In