To edit, add comments or upload photos: Sign In
PLN ULP Watescharging location
Nearest Address:
Jl. KH Ahmad Dahlan
Kulon Progo
Yogyakarta
55651
Indonesia
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Rp2467/kWh + tax
Operational Status:
Operational
Latitude:
-7.8660434
Longitude:
110.1507383
OCM Ref: OCM-270814
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-460703
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
2 Present
OCM-CN-460704
100 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-848751
120 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-848752
180 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 4 matching results
Hotel Morazen Yogyakarta
Hotel Morazen Yogyakarta,
Jl Wates - Purworejo
Kab Kulon Progo
Daerah Istimewa Yogyakarta
55654
Indonesia
View
6 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Bantul
PLN ULP Bantul,
Jl. Dr. Wahidin Sudiro Husodo, Karangbayam
Kabupaten Bantul,
Daerah Istimewa Yogyakarta
55714
Indonesia
View
12.83 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Purworejo
14.22 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Taman Sari
Hotel Taman Sari, Jl Letjen S Parman,
Gedongkiwo
Yogyakarta
Daerah Istimewa Yogyakarta
55252
Indonesia
View
14.56 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In