Skip to content
Charging location

Posto BR - Pau Seco

OCM-264457 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Rodovia Washington Luís
Araraquara
São Paulo
14803-036
Brazil

Summary

Number Of Stations/Bays
1
Usage
Public - Membership Required
Operational Status
Operational
Latitude
-21.783152938628362
Longitude
-48.22408714864679
OCM Ref
OCM-264457

Network/Operator

Enel X

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
70 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - No comments or check-ins
  • User Feedback - No photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

2 present
Operational
150 kW
DC

Type 2 (Tethered Connector)

1 present
Operational
22 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 4 matching results

AV MARIA ANTONIA CAMARGO DE OLIVEIRA, 3347, Vila Ferroviária, São Paulo, 14802-355, Brazil
3.56 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
R. José Barbieri Neto, 1961 - Cidade Jardim, Araraquara - SP, 14805-000, Araraquara, Brazil
3.7 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Rodovia Washington Luís, Ibate, São Paulo, 14815-000, Brazil
13.93 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Rod. Washington Luiz, km 255 - rural, Ibaté - SP, 14815-000, Ibaté, Brazil
13.98 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Tethered Connector)
Upload your own photos for this location Sign In