Skip to content
Charging location

Be Charge

OCM-260770 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Summary

Number Of Stations/Bays
2
Usage
Public
Operational Status
Operational
Latitude
44.60365
Longitude
10.69009
OCM Ref
OCM-260770

Network/Operator

Be Charge (Italy)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

4 present
Status Unknown
22 kW
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Via Statale 22, Scandiano, RE, Italy
0.39 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Giuseppe Mazzini 72/1, Scandiano, RE, Italy
0.53 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Viale della Repubblica 35, Scandiano, RE, Italy
0.74 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Palmiro Togliatti 7, Scandiano, RE, Italy
0.84 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Ubersetto, 59, Scandiano, 42019, Italy
0.89 Miles Private - For Staff, Visitors or Customers Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Via Giuseppe Pagliani 1, Scandiano, RE, Italy
2.01 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Santa Rizza 13, Casalgrande, RE, Italy
2.37 Miles Public Operational Level 3: High (Over 40kW) CHAdeMO

Acea

1 5
Via Karl Marx 14, Casalgrande, RE, Italy
2.47 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Antonio Gramsci 2, Albinea, RE, Italy
2.49 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2023-04-29
Uploaded by ForumElettrico.it on 2023-04-29
Uploaded by ForumElettrico.it on 2023-04-29
Uploaded by ForumElettrico.it on 2023-04-29
Uploaded by ForumElettrico.it on 2023-04-29